Visible progress has been slow, but lots of little jobs have been done that nobody will ever notice. Motivation low to do time consuming work, so fitted 2 headlights that I had to see some shapes. I Don't think either is right, square one sits too low and round single is too big. Plan at this stage is for twin small singles. Just food for thought. New wiring loom backbone is done, will be time to test run soon.
Megelli 250
This is my second project. Mild engine work, a new tank and seat, ill use the swingarm and underseat exhaust. Ill drop the front forks a little and rewire with minimal styling and none of the plastic fairings. Archives
September 2013
Categories |